GUWAHATI: Work will start for the much-awaited Guwahati-North Guwahati bridge from March 2019 as per PWD minister Dr. Himanta Biswa Sarma.
Speaking at a panchayat poll campaign meeting in North Guwahati the minister assured the gathering that the bridge connecting Guwahati to North Guwahati will have a six-lane road and will come as a relief to people living on both sides of the river.
{{PRx6ntEp8c4ucb9q4yvj}}
More News :
The estimated cost of the bridge is pegged at Rs. 1,950 crore and the major share will be funded by BRICS New Development Bank.