+

Guwahati: Maligaon Foot Over Bridge To Be Demolished Within A Month

 

GUWAHATI: The Maligaon foot over-bridge will be demolished within a month, as per sources at the Public Works Department (Roads). This was also confirmed by the Guwahati Metropolitan Development Authority (GMDA).

As per sources, the foot over-bridge has to be taken down to facilitate the construction of the Kamakhya-Maligaon flyover. 

"It is a known fact that the bridge is coming on the way of the new flyover. We are taking it down within a month," a source said. 

Reportedly, a meeting was held today, September 2, amongst officials of PWD (Public Works Department) and GMDA departments in this regard. 

Notably, the Maligaon foot over-bridge was renovated in 2018. Strengthening of the structure was done by an Assam-based company and two lifts were added at both ends by a Mumbai-based firm. 

With the foot over-bridge to be demolished, PWD reportedly has to pay a certain amount of money to both the firms as well as GMDA. The bridge will be demolished as soon as the decision on payments is made, the source added.

 

facebook twitter